Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Bambrick, B (1994) Construction of an Island. Journal of Construction Engineering and Management, 120(01), 223–7.

Gordon, C M (1994) Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120(01), 196–210.

  • Type: Journal Article
  • Keywords: Construction management; Contracts; Contract management; Project management; Turnkey projects;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(196)
  • Abstract:
    This paper examines the compatibility of various construction contracting methods with certain types of owners and projects. Contracting methods, as defined in this paper, consist of four parts: scope, organization, contract, and award. An owner must create an appropriate contracting method for each project. It was determined that there are six main organizations around which the contracting variations are created: general contractor, construction manager, multiple primes, design‐build, turnkey, and build‐operate‐transfer. The most common method is the traditional system of an independent designer, a general contractor, and a competitively bid, lump‐sum price. This method is efficient in many cases; however, in some situations, alternative methods are more appropriate and should be explored. Choosing certain methods can decrease the project duration, provide flexibility for changes, reduce adversarial relationships, allow for contractor participation in design, provide cost savings incentives to the contractor, and provide alternative financing methods. Guidelines are established to help the owner choose the organization, contract type, and award method most applicable for their project and themselves.

Grimm, C T (1994) Void Mortar Joints: Bane of Brick Masonry. Journal of Construction Engineering and Management, 120(01), 152–61.

Halligan, D W, Demsetz, L A, Brown, J D and Pace, C B (1994) Action‐Response Model and Loss of Productivity in Construction. Journal of Construction Engineering and Management, 120(01), 47–64.

Ledbetter, W B (1994) Quality Performance on Successful Project. Journal of Construction Engineering and Management, 120(01), 34–46.

Oloufa, A A, Eltahan, A A and Papacostas, C S (1994) Integrated GIS for Construction Site Investigation. Journal of Construction Engineering and Management, 120(01), 211–22.

Riad, N I, Arditi, D and Mohammadi, J (1994) Integrated System for Managing Owner‐Directed Project Acceleration. Journal of Construction Engineering and Management, 120(01), 77–95.

Russell, A D and Fayek, A (1994) Automated Corrective Action Selection Assistant. Journal of Construction Engineering and Management, 120(01), 11–33.

Russell, J S, Gugel, J G and Radtke, M W (1994) Comparative Analysis of Three Constructability Approaches. Journal of Construction Engineering and Management, 120(01), 180–95.

Rwelamila, P D (1994) Group Dynamics and Construction Project Manager. Journal of Construction Engineering and Management, 120(01), 3–10.

Tanwani, R and Iseley, D T (1994) Tracking and Steering Systems in Trenchless Construction. Journal of Construction Engineering and Management, 120(01), 65–76.

Teicholz, P and Fischer, M (1994) Strategy for Computer Integrated Construction Technology. Journal of Construction Engineering and Management, 120(01), 117–31.

Thabet, W Y and Beliveau, Y J (1994) Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. Journal of Construction Engineering and Management, 120(01), 96–116.

Thomas, H R and Sakarcan, A S (1994) Forecasting Labor Productivity Using Factor Model. Journal of Construction Engineering and Management, 120(01), 228–39.

Warszawski, A and Rosenfeld, Y (1994) Robot for Interior‐Finishing Works in Building: Feasibility Analysis. Journal of Construction Engineering and Management, 120(01), 132–51.

Wu, R W and Hadipriono, F C (1994) Fuzzy Modus Ponens Deduction Technique for Construction Scheduling. Journal of Construction Engineering and Management, 120(01), 162–79.